Centre for Science and Environment


The Gare Palma Coal Sub Block IV/6 was allotted jointly to M/s Jindal Steel & Power Limited & M/s Nalwa Sponge Iron Limited by the Ministry of Coal on January 13, 2006 to meet the coal-requirement of their respective Sponge Iron Plants situated at distances of 45 km and 25 km from the Coal Block at Raigarh & Taraimal respectively.

LOCATION:

The Mormugao port located in North Goa is planning to develop a waterfront (new harbor and breakwater) west of the breakwater at the existing Mormugao port. WAPCOS has prepared the Environment Impact Assessment report for the project.

pix7.jpg

We recently got together with our partners for a one day training workshop on Green Clearance Watch (GCW) Portal on November 19, 2012. The program brought together our partners who have helped us to cover public hearings around the country and will be working with us in future.

pix7.jpg

Pollution in Sonbhadra area is not new and has been talked about for many years but no action has been taken to check the pollution. This has led to long term health impacts which have now started to show up in the population of the region. CSE took up a study to look at these health impacts and to investigate the possible causes.

Are environment and forest clearances a hindrance to development in the country?

No, says our study. The study analyses the environment and forest clearances granted during the 11th Five Year Plan, from April 2007 till August 2011.

The pace of such clearances during this period has been unprecedented. 

Click on the below links to find more on the study

 

The Ministry of Environment and Forests (MoEF) on September 14, 2012 has constituted a committee to look into violations of environmental and coastal regulation zone clearances by Adani Port and SEZ Ltd. in Mundra taluka of Kutch district in Gujarat.

Public hearing video of the Proposed Green field Integrated Cement Plant Project of Orient Cement  - Part I
 

Centre for Science and Environment (CSE) presented its environmental assessment of Jasodharpur Industrial Area (JIA) in a public meeting on June 11, 2012 held at Maganpur village near Kotdwar town in Pauri Garhwal district of Uttarakhand.

The Uttarakhand Environment Protection and Pollution Control Board had requested CSE to carry out this assessment.

Centre for Science and Environment carried out the technical analysis of the EIA-EMP report of Gare Pelma Block III coal mining and washery. This was on a request from Raghubeer Pradhan of Ekta Parishad. The project is to come up in the Mand-Raigarh coalfields in Raigarh district of Chhattisgarh.
 
Read the review:

posco.jpg

In a stirring judgement passed by the National Green Tribunal (NGT), the green signal given to South Korea’s Pohang Iron and Steel Company (POSCO) to go-ahead with their mega steel project in Odisha has been suspended.

Photograph courtesy: Sri Alok Putul (Senior Journalist)  
   

In the hot-seat of Chhattisgarh, another controversial public hearing took place in the process of granting environmental clearance to the proposed expansion of a coal washing facility.

Centre for Science and Environment (CSE) carried out a technical analysis of the EIA report of the expansion project of thermal power plant of M/s Korba West Power Company Limited. The analysis was carried out on the request of Raghuvir Pradhan of Ekta Parishad. The public hearing for the project was scheduled on February 9, 2012.

A CSE representative was present at the public hearing of a coal washery in Raigarh, Chhattisgarh.

Watch NOW to know what ensued

New Delhi, October 13, 2011: Centre for Science and Environment (CSE) has expressed its strong disagreement with some of the contents of an ‘open letter to leaders’, written recently by India’s top industrialists. In a response to the open letter, CSE’s director general Sunita Narain has refuted the industry leaders’ contention that environmental clearances are delaying projects and hampering growth.

Centre for Science and Environment (CSE) analysed the EIA report of an upcoming thermal power plant of 4,000 megawatt (MW) in Jamnagar district of Gujarat.Mahesh Parmar of Paryavaran Mitra approached CSE to carry out a technical review of this EIA for the public hearing of the project on September 20, 2011.

Centre for Science and Environment (CSE) analysed the EIA report of an upcoming coal washery project in Raigarh district of Chhattisgarh. Raghubeer Pradhan of Ekta Parishad approached CSE to carry out a technical review of this EIA for the public hearing of the project on August 29, 2011.

See also

Ramesh Agrawal is not a hardcore criminal but is paying the price of bringing a company's wrong doings to light. Ramesh along with Harihar Patel was arrested on May 28, 2011 as a result of a case filed by Jindal Steel and Power Limited (JSPL). 

Centre for Science and Environment (CSE) carried out an analysis of the EIA of expansion of Gujarat Pipavav Port located in the Gulf of Cambay. The analysis was requested by a Gujarat based NGO called Paryavaran Mitra.

mines_violates.jpg

The public hearing for the expansion of Bhatin mines of Uranium Corporation of India Limited (UCIL) was held on May 26, 2011. The public hearing was a clear violation the EIA notification and did not allow stakeholders to participate in the process. CSE representative was there to cover the public hearing but was not allowed inside. Read on to know what ensued:

nirma.jpg

The Expert Committee (EC) set up by the Ministry of Environment and Forests (MoEF) on order from the Supreme Court to assess the matter of the Nirma Cement plant submitted its report to the court on May 10, 2011. The EC set up under the chairmanship of Prof. CR Babu had visited the site on April 18.

sponge iron

The report assesses the regulatory status of the sponge iron industry in India. Based on inspection information collected from various State Pollution Control Boards (SPCBs),
the report is a detailed account of the industry in four states - Odisha, West Bengal, Chhattisgarh and Jharkhand.

Follow us on 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 