Jayaswals Neco Ltd. (JNL) is planning to set up an 1.2 million tonnes per annum (TPA) coal mining project in Raigarh district of Chattisgarh. On behalf of the local community there, two activists (from Ekta Parishad and Jan Chetna) requested the Centre for Science and Environment, New Delhi, to technically evaluate the Rapid Environment Impact Assessment done for the project.

Expansion of Mine lease in Gare IV/1 is beign proposed by Jindal Steel and Power Limited. Ekta Parishad on behalf of the local communities of Raigarh district of Chattisgarh requested us to technically evaluate the Environmental Impact Assessment (EIA) document of Gare IV/1 Coal Mine Extension project at Village Nagarmuda, Janjgir, Tapranga, Dongamauha, Dhaurabhanta and Aamgaon in Tehsi; Gharghoda, District Raigarh of Chattisgarh.

The M/s Korba West Power Company Limited. is planning to set up a thermal power plant of 600 MW (2 x 300) coal based thermal Power Plant at Village-Bade Bhandar, District-Raigarh, Chhattisgarh. The EIA has been prepared by the Nagpur -based consultant, Anacon Laboratries PvT. Ltd. The study area for the EIA study is 10-km radius.

A representative of National Centre for Advocacy Studies based in the state of Maharashtra, working towards strengthening rights based and people centred advocacy in India and South Asia, requested us, on behalf of the POSCO Pratirodh Sangram Samiti (PPSS- a mass based people’s rights movement against the POSCO project impacts), to technically evaluate the Marine Environmental Impact Assessment (EIA) document of Captive Minor Port of POSCO – India Private Limited, Bhubaneswar, located at Jatadharmohan Creek near Paradeep in State of Orissa.

A coal washery Plant is being proposed by M/s Sarda Energy & Minerals Limited., (SEML). Ekta Parishad, on behalf of the local communities of Raigarh district of Chattisgarh, has requested us to technically evaluate the Environmental Impact Assessment (EIA) document of Coal Washery Plant of 400 tonnes per hour throughput capacity at Village Bajarmura – Dholnara in Tehsil; Gharghora (now Tamnar, District Raigarh of Chattisgarh.

A representative from Ekta Parishad, a non-governmental organisation (NGO) working in the state of Chattisgarh on various social and environmental issues requested us on behalf of the local communities and NGOs of Kashipur Block in Raygada district of Orissa to technically evaluate the Environmental Impact Assessment (EIA) document of  M/s Visa Steel Limited proposing a Greenfield Integrated Steel plant near Kotarlia, Kotmar and Patrapali villages, Raigarh district of Chattisgarh state.

An expansion of existing plant to produce 97,000 TPA of MS Billets and 65 MW of Power Generation is being proposed by M/s Salasar Steel and Power Limited. 

Background of the report
An expansion of existing plant to produce 97,000 TPA of MS Billets and 65 MW of Power Generation is being proposed by M/s Salasar Steel and Power Limited, Raghuveer Pradhan from Ekta Parishad on behalf of the local communities of Raigarh district of Chattisgarh has requested Centre for Science and Environment (CSE) to technically evaluate the Environmental Impact Assessment (EIA) document of:

  1. Expansion to produce 97,000 TPA of MS Billets and 65 MW of Power Generation through CFBC at Gerwani Village, Ambikapur Road, Raigarh, Chattisgarh.