Last fortnight, the Supreme Court issued a diktat to the government to implement the scheme to interlink rivers. The directions are straightforward.
CSE released its cover story on the rapid industrialisation in Chhattisgarh on November 15, 2010 at Raipur, Chhattisgarh. The event was organised by Ekta Parishad. The cover was based on a detailed analysis of the proposed industries in the state, their land and water requirement and whether that state will be able to meet this requirement.
The M/s Korba West Power Company Limited. is planning to set up a thermal power plant of 600 MW (2 x 300) coal based thermal Power Plant at Village-Bade Bhandar, District-Raigarh, Chhattisgarh. The EIA has been prepared by the Nagpur -based consultant, Anacon Laboratries PvT. Ltd. The study area for the EIA study is 10-km radius.