Rapid EIA for 600 MW (2 x 300) Coal Based Thermal Power Plant at Village-Bade Bhandar, Raigarh | Centre for Science and Environment


Rapid EIA for 600 MW (2 x 300) Coal Based Thermal Power Plant at Village-Bade Bhandar, Raigarh

Announcements

  • The fast growing economy, rapid industrialisation and growing urban population in India along with increasing wastewater generation are reasons for concern and reiterate the need for appropriate water management practices. Centre for Science and Environment recognises this need and has developed a five-day hands on training programme aimed at giving practical exposure to participants on wastewater treatment for industrial and urban wastewater management including reuse and recycle.

  • Date: December 1-5, 2014

    India has about 3.3 million kilometers of road network, which is the second largest in the world. Apart from the development and growth that these projects bring, they also have adverse environmental and social impacts.

    Environmental Impact Assessment (EIA) is an important tool to inform decision-makers, regulators and stakeholders, about the possible environmental, social and economic costs of such projects.

Follow us on 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
gobar times