Behrampur Sewage Treatment Plant: Gurugram, Haryana

 
Key Highlights of the Projects
 
Year of Commission

2010 & 2015

Total Installed Capacity

50 & 120 MLD

Total Utilization Capacity

45 & 110 MLD

Treatment Technology

Activated Sludge Process and Sequencing Batch Reactor

Current Reuse

Industrial, Horticulture, Construction and Waterbodies/Forest

Volume of Water Reuse Daily

51 MLD (14MLD-Tertiary and 37MLD- Secondary)

Quality of treated water (Outlet)

pH- 6.9. BOD-6mg/l, COD-32mg/l, TSS-2mg/l

Economics

Rs. 4 per KL at the STP site and Rs. 5per KL at doorstep. Free for agricultural use.

 
Current Reuse Practice Horticulture and green belts
 
Smaller hydrant (access point) near Almeda Chowk, Sector 70, Gurugram from where the treated water is used for horticulture
Treated wastewater is extensively used for the maintenance and development of green belts and parks in Gurugram. Water from the main pipeline is supplied to hydrants, located at 30-meter intervals. These hydrants play a crucial role in supplying treated water for green belt development in different parts of the city, including Sector 52 and South City, the Southern Peripheral Road, Sector 36, and Sector 38
 
Industrial Use
 
Existing pipeline network at Behrampur STP used for supplying treated used water for textile industries in Sector 34, Gurugram
The Behrampur STP supplies 5–7 MLD of tertiary-treated water to the textile industry in Sector 34, meeting stringent quality standards (BOD < 5 mg/l, TSS < 30 mg/l, TDS < 500 mg/l). Textile units conduct four daily quality tests, ensuring reliability. Priced at Rs 2/kl, this cost-effective water generates an additional Rs 3 lakh in monthly revenue, compared to the Rs 5–6/kl cost of groundwater.
 
Restoration of Waterbodies
 
Restored water body in Aravalli hills (Sakatpur road) using treated used water.
Treated wastewater from Behrampur STP is used to restore 20 waterbodies in Sakatpur/Gairatpur Bas village via an 8-km treated water pipeline.
 
Construction
 
Treated wastewater from Behrampur STP is used to restore 20 waterbodies in Sakatpur/Gairatpur Bas village via an 8-km treated water pipeline.
 
Challenges and Opportunities
 
Treated wastewater from Behrampur STP is used to restore 20 waterbodies in Sakatpur/Gairatpur Bas village via an 8-km treated water pipeline.

Challenges

Opportunities

Maintenance issues

Circular economy potential

Infrastructure gaps

Industrial partnerships

Regulatory compliance barriers

Environmental restoration

Lack of awareness and acceptance

Policy and regulatory support

Cost recovery difficulties

Technological advancements

 
Contact Details
Department- Gurugram Metropolitan Development Authority (GMDA)
Email - headit.gmda@gov.in

 

Tags: