ON THE TRACK: Is India on track to meet its Renewable Energy target of 175 GW by 2022. If not, why not? What can and must be done to ensure that we can move to cleaner energy, which meets the needs of all

PART A The big picture: Where we stand today 
A.1 India has set up a target of 175 GW of installed renewable energy (RE) capacity by 2022. Currently, this target – adding up solar, wind and other sources of energy – stands at 85.91 GW (December 2019) (see Graph 1). Its share in power generation in 2018-19 was less than 10 per cent. 