Site visit done by: Amrita Bhatnagar
Date of visit: 19 July, 2017
Location: Near Kashmere gate metro station (28.676352, 77.231450) |
Designed Capacity: 5000 litres (each biodigester) |
Scale:Night shelter (serves ~200 people/day) |
Operational since: 2016 |
Implementing Organisation: DUSIB |
Capital Cost: INR 8 Lacs (approx) |
Area: 10 square meters (approx.) |
O&M: INR 48,000/ year (cost of inoculum) + INR 24,000/ month (salary for 2 workers) |
Project Background
The technology was installed to reduce dependency on septic tanks as the night shelter is used by close to 200 people every night and is in close proximity (20 meters) to the Yamuna river bio digester was seen as a faster alternative to septic tank
Treatment technology
Contact details:
Mr. Anil Bhan
Superintendent Engineer
9717999347
Share this article