FSTP at Kanchipuram, karhankuzi, Tamil Nadu

Capacity

23.4 KLD

Area of installation

4048 sq m

Inlet

Excreta + Flush water

+ Urine + Anal cleansing

Water

Outlet

Treated effluent

Year of Installation

2018

Capital investment (INR)

Rs 4.93 Cr

Scale of service

10507households/ all of
Karunguzhi city

Treatment time

N/A

Location of the technology:12°31'58.6"N 79°54'13.5"E

Need for technology

To reduce the health hazard caused by the dumping of septage in water bodies and open spaces in Karunkuzhi Town Panchayat and Madurantakam Municipal area

System description

The treatment process of FSTP starts with a preliminary screening of septage emptied from the trucks followed by a solid liquid separation in Sludge Drying Beds (SDB). Leachate from the SDB is treated in a Horizontal Plant Gravel Filter (HPGF). The filtered effluent is further treated in a maturation pond. The final treated water is collected and stored for reuse

Operation and maintenance:

Electricity Consumed ( In units)

N/A

Maintenance of the installation

N/A

O&M cost (INR)

 Rs 10 Lakhs per year



Picture annexure: