Tihar Jail's Rainwater Harvesting System

RAINWATER AVAILABLE FOR HARVESTING Total area (Ward 1 and Ward 13): 4125 square meters (Sq m) Average annual rainfall in Delhi: 611 millimeters (mm) Total volume of water harvested: 1280 cubic meter (m³) or 12,80,000 litres This represents 50.78 per cent of total rainwater harvesting potential.

Garden Estate Rainwater Harvesting System

RAINWATER AVAILABLE FOR HARVESTING  Total area - 89,012 square metres (Sq m)  Average annual rainfall in Gurgaon - 577.8 millimetre (mm)  Total volume of water harvested - 23549.32 cubic metre (m³) or 2,35,49,320 litres This represents 45.8 per cent of the total rainwater harvesting potential.

Spinal Injury Centre's Rainwater Harvesting System

RAINWATER AVAILABLE FOR HARVESTING Total area - 52,598 square metres (Sq m) Average annual rainfall in Delhi - 611 millimetre (mm) Total volume of water harvested - 27,317 cubic metre (m³) or 273,17,000 litres This represents 85 per cent of the total rainwater harvesting potential.

BPCL Housing Complex Rainwater Harvesting System

RAINWATER AVAILABLE FOR HARVESTING Total rooftop and surface area: 13,910 square metres (sq m) Average annual rainfall in Noida: 792.4 millimetres (mm) Total Volume of rainwater harvested: 4,446 cubic metres (m 3 ) or 44,50,000 litres Therefore, 85 per cent of the total rooftop and surface runoff is being harvested.

Defence Colony Rainwater Harvesting System

RAINWATER AVAILABLE FOR HARVESTING Total rooftop and surface area: 26,087 square metres (sq m) Average annual rainfall in Delhi: 61 1.8 millimetres (mm) Total volume of rainwater harvested: 9,563 cubic metres (m3) or 95,63,494 litres Therefore, 60 per cent of the total rooftop and surface runoff is being harvested.

Hero Honda Motors Rainwater Harvesting System

RAINWATER AVAILABLE FOR HARVESTING  Total rooftop area:  11,080 square metres (sq m)Av erage annual rainfall in Gurgaon:4  577.8 millimetres (mm) Total rainwater available from rainfall: 5,441 metre cubic (m 3 ) or 54,41,720 litres (Which is 85 per cent of total rainwater harvesting potential of these buildings.)

Anup Ahuja's Farm House Rainwater Harvesting System

RAINWATER AVAILABLE FOR HARVESTING Total rooftop and surface area: 1,250 square metres (sq m) Average annual rainfall in Delhi: 611.8 millimetres (mm) Total volume of rainwater harvested: 272 cubic metres (m3) or 2,72,811 litres Therefore, 60 per cent of the total rooftop and surface runoff is being harvested.

Surya Vihar Rainwater Harvesting System

RAINWATER AVAILABLE FOR HARVESTING Total rooftop and surface area: 44,029square metres (sq m) Average annual rainfall in Gurgaon:  577.8 millimetres (mm) Total volume of rainwater harvested:  18,207 cubic metres (m 3 ) or 1,82,07,031 litres Therefore, 85 per cent of the total rooftop and surface runoff is being harvested.