Pehowa Sewage Treatment Plant- Kurukshetra, Haryana

 
Key Highlights of the Projects
 
Year of Commission

2015

Total Installed Capacity 8 MLD
Total Utilization Capacity 5.5 MLD
Treatment Technology Moving Bed Biofilm Reactor
Current Reuse Irrigation Purpose
Volume of Water Reuse Daily 2.5 MLD
Quality of treated water (Outlet) pH- 7.8. BOD-18mg/l, COD-48mg/l, TSS-27mg/l
Economics NA
 
Current Reuse Practice
 
Chamber constructed by farmer where the treated water enters from the canal which is then used for agriculture in Chhapra village, Kurukshetra district, Haryana
• Treated water is stored in a reservoir and distributed via 6,084-meter underground pipelines to Pehowa and Morthali villages, with access points every two acres.

• A 27.5 kW solar plant powers pumps for 14 hours daily.

•Project Cost: Approximately ₹1 crore.

• Produces 1.5 MLD of treated water, irrigating 188 acres cultivated by 16 farmers.

• Forest Use: Supplies 1–1.25 MLD every alternate day to a 7-acre forest area, aiding its maintenance and growth.
 

 