Key Highlights of the Projects | |
Year of Commission |
2016 |
Total Installed Capacity | 130 MLD |
Total Utilization Capacity | 130 MLD |
Treatment Technology | Sequencing Batch Reactor with tertiary treatment |
Current Reuse | Thermal Power Plant (Cooling Purpose) |
Volume of Water Reuse Daily | 130 MLD (Tertiary Treated) |
Quality of treated water (Outlet) | pH- 7.4. BOD-3.6mg/l, COD-11mg/l, TSS-2.3mg/l |
Economics | NA |
Project Overview | |
• BWSSB commenced tertiary treatment of secondary treated water from Raja Canal STP for industrial use. |
|
Implementation Cost | |
• 18 km dedicated pipeline connects Raja Canal STP to TTP. |
|
Current Operations | |
• Operating below capacity, treating only 5 MLD due to low industrial demand. |
|
Industrial Usage and Pricing | |
• Primary use: Horticulture within industrial premises. |
|
Quality Monitoring | |
• In-house and third-party lab tests conducted monthly. |
|
Quality parameters | |
• pH: 7.68, Dissolved Oxygen: 4.4 mg/L, Biological Oxygen Demand: 3.2 mg/L, Chemical Oxygen Demand: 7.2 mg/L, Total Suspended Solids: 3.8 mg/L |
|
Share this article