The case study provides a City Drainage Plan / Stormwater Master Plan with an effective methodology in line with technical analysis. The objective of the Climate Adaptation Plan and the Cloudburst Management Plan is to build urban resilience against extreme rainfall events, through adopting measures to prevent pluvial flooding and the focus is on integration of various physical development process. The contents provided in this case study is based on secondary research from open sources mentioned in reference section and don't necessarily reflect those of Centre for Science and Environment..

Landuse:
Institutional:
Parks and Open Spaces:
Transport and Utilities:
Scale:
Regional:
City:
Objectives:
Urban Flood Mitigation:
Ownership:
Government:
Intervention:
Project:
Policy:
Plan: